Click For Crochet Abbreviations List
Dimensions: 38/40 (42/44) 46/48.
You will need: 300 (350) 400 g of pink and 200 (250) 250 g of orange Laguna yarn (80% viscose, 20% silk, 77 m / 50 g); straight and circular needles number 5.
Wrong surface: persons. R. - ex. n., izn. R. - persons. P.
Central pattern (width 23 p.): Knit according to scheme 1, which shows only persons. r., in izn. R. knit loops on the pattern, knit knit izn. Repeat from 1st to 14th p.
Openwork pattern: the number of loops is a multiple of 4 + 2 chrome. Knit under the scheme 2, which shows the persons. and izn. R. Start with 1 chrome., Repeat rapport, finish 1 chrome. Repeat from 1st to 4th p.
The sequence of alternating bands: 14 p. pink and orange alternately.
Knitting density Out smooth surface and central pattern: 16.5 p. and 27 p. = 10 x 10 cm; openwork pattern: 16 p. and 22 p. = 10 x 10 cm
Back: dial with pink thread 95 (103) 111 p. And tie 1 w. R. individuals. This series is not taken into account in the further account. Then knit in the specified sequence: chrome., 35 (39) 43 p. Izn. smoothing, 23 p. of central pattern, 35 (39) 43 p. izn. smooth When changing colors in the loops izn. smooth knit 1st person. R. new color faces. Through 41.5 cm = 112 p. (44.5 cm = 120 p.) 47.5 cm = 128 p. from the edge of the edge, close for bevels of the shoulder on both sides 4 (5) 6 p. and in each 2nd p. 5 x 4 items (3 x 5 and 2 x 4 items) 5 x 5 items. At the same time after 43.5 cm = 118 p. (46.5 cm = 126 p.) 49.5 cm = 134 p. from the edge of the dial, close the middle section 29 for the neckline cut and finish both sides separately. For rounding up close from the inside edge in every 2nd p. 1 x 3 and 1 x 2 p. After 46 cm = 124 p. (49 cm = 132 p.) 52 cm = 140 p.
Before: knit the same way, but for a deeper neckline close after 37 cm = 100 p. (40 cm = 108 p.) 43 cm = 116 p. from the typesetting edge of the average 17 p. and in each of the 2nd p. 1 x 3, 2 x 2 and 4 x 1 p.
Sleeves: dial 42 (50) 58 p. With pink thread and tie 1 w. R. individuals. Then knit openwork pattern. At the same time, add the sleeves from both sides alternately in each 6th and 8th p. 5 x 1 p. = 52 (60) 68 p., Including the added loops in the pattern. After 21 cm = 46 p. from the edge of the dial all the loops close.
Assembly: perform shoulder seams. According to the neckline, dial 80 p. With circular needles with pink thread, tie 3 circular p. individuals. and all loops are free to close faces. Sew in sleeves, complete side seams and sleeve seams.
Source