Click For Crochet Abbreviations List
size: 46/48
you will need: 450 g of yarn Alpina «Alpaca Trenza» (90% alpaca, 10% polyamide; 150 m / 50 g), a beige color; light yellow glass beads; yellow sequins; Knitting needles number 3; hook number 3.
Knitting technique.
Wrong surface: persons. R. - ex. n., izn. R. - persons. p.
Gum 1x1: alternately 1 person. n., 1 out. n.
Pattern "check": knit according to the scheme. Repeat from the 1st to the 8th row.
Pattern "diamonds": knit according to the scheme. Repeat from the 1st to the 16th row.
Knitting density: 16 p. And 25 p. = 10 cm x 10 cm.
DESCRIPTION OF WORK
Back: beige yarn on the needles number 3 dial 119 p. And knit 1 row of i. n. (this series is not taken into account in the further calculation of the series). Distribute loops as follows: 1 chrome. n., 7 int. p., * 13 p. according to the scheme of the tick pattern, 10 out. p. *, repeat from * to * 3 times, 13 p. according to the scheme of the tick pattern, 7 res. Clause, 1 chrome. n and knit on distributed loops. To narrow the web in the 33rd row from the start of work, close 1 point before and after wear. n. tracks, a total of 10 p. On the spokes of 109 p. Then in each 33rd row 2 times 10 p. (in the 65th row and 97th row). On the needles of 89 p. From the 113th row from the beginning of work, knit the pattern of "diamonds". In the 121st row from the beginning of work, close on 1 p. Before and after wear. n. tracks, total 10 p. On the needles 79 p. For the design of lines, armholes in the 129th row from the beginning of work, close on both sides 4 p.,
Before: beige yarn for knitting needles No. 3 dial 119 points and knit 1 row of shoes. n. (this series is not taken into account in the further calculation of the series). Distribute loops as follows: 1 chrome. n., 7 int. p., * 13 p. according to the scheme of the tick pattern, 10 out. p. *, repeat from * to * 3 times, 13 p. according to the scheme of the tick pattern, 7 res. Clause, 1 chrome. n and knit on distributed loops. To narrow the web in the 33rd row from the start of work, close 1 point before and after wear. n. tracks, a total of 10 p. On the spokes of 109 p. Then in each 33rd row 2 times 10 p. (in the 65th row and 97th row). On the needles of 89 p. From the 113th row from the beginning of work, knit the pattern of "diamonds". In the 121st row from the beginning of work, close on 1 p. Before and after wear. n. tracks, total 10 p. On the needles 79 p. For the design of lines, armholes in the 129th row from the beginning of work, close on both sides 4 p., then in each 2nd row 1 time by 2 p., 2 times by 1 p. On the spokes of 63 p. For the design of the neckline in the 43 rd row from the beginning of the lines of armholes close the average 13 p. and on both sides of them 3 times by 2 points for each 2nd row, 1 point for 1 time. On paragraph 18 needles. In the 53rd row from the beginning of the lines, pass through all the loops in the same row. The left shoulder to perform similarly.
Left sleeve: beige yarn on knitting needles No. 3 dial 41 p. And knit 1 row out. n. (this series is not taken into account in the further calculation of the series). Distribute loops as follows: 1 chrome. n., 5 out. p., 13 p. according to the scheme of the pattern "tick", 5 out. p., 13 p. according to the scheme of the pattern "tick", 5 out. Clause, 1 chrome. n and knit on distributed loops. For expansion of the sleeve in the 8th row from the beginning of work, add 1 p. On the needles of 63 p. To design the line of the rounded sleeves in the 113th row, from the beginning of work, close on both sides by 5 p. 2 p. on the needles of 9 p. In the 39th row from the beginning of the line of the neck line all the loops close in the same row.
Right sleeve: knit like left sleeve.
Assembly: perform shoulder and side seams. Run seams on the sleeves. Sleeves sew in the armhole. Tie the neckline and the bottom of the sleeves in a circle using hook number 3 as follows:
1st row: Art. b / n;
2nd row: * 2 tbsp. b / n in the following article. b / n the previous row, 1 pic of 3 air. n. *, repeat from * to * to the end of the row. Each row to end the connection. Art.
Bottom jackets tie around in a circle using hook number 3 as follows:
1st row: Art. b / n;
2nd row: "pitch step". Each row to finish using Comm. Art.
The line of the neckline and before decorate with sequins and beads on the photo.