Amy

Tunic with zigzag pattern

Click For Crochet Abbreviations List

DIMENSIONS 
34/36 (40/42) 46/48 

YOU WILL NEED 
Yarn (60% silk, 40% cotton; 115 m / 50 g) - 200 (250) 250 g of mallow color; 
yarn (55% cotton, 25% polyamide, 20% silk; 125 m / 50 g) - 50 (100) 100 g of mint, lilac and gray-blue each; Knitting needles № 4,5; hook number 4. 

PATTERNS AND 

CIRCUITS ZIGSAG PATTERNS 
The number of loops must be a multiple of 18 + 1 + 2 chrome. 

Knit according to the above scheme. On it are given the facial and purl rows. 

In width start chrome., Repeat rapport, finish loop after rapport and chrome. 

In the height of 1 time knit from the 1st to the 12th row, then repeat from the 5th to the 12th row. 

SEQUENCE 
OF COLORS Knit 4 p. mallow colors,
* 4 p. Mint, Mallow, Lilac, Mallow, Gray-Blue and Mallow, 
from * Repeat. 

BEDGED Knit 
in the facial rows purl, in the purl rows of facial loops. 

KNITTING DENSITY 
27 p. X 29.5 r. = 10 x 10 cm, connected by a zigzag pattern; 
19 p. X 31.5 p. = 10 x 10 cm, connected by a purl. 

PERFORMANCE OF WORK OF THE 
BACK 
Thread in the color of the mallow dial 111 (129) 147 p. And knit with a zigzag pattern, changing the color of the thread in the specified sequence. 

After 40.5 cm = 120 p. continue to knit purl thread color mallow, while for a more accurate transition of colors knit in 1 st persons. a number of facial and in the same series to subtract, evenly distributing, 33 (37) 43 p. = 78 (92) 104 p.

For armholes close on both sides after 1.5 cm = 4 p. from the end of the change of the color of the thread 1 time for 3 p., then in each 2nd p. 2 times by 2 points and 2 times by 1 point = 60 (74) 86 points. 

Through 17 (19) 21 cm = 54 (60) 66 p. from the end of the thread color change, close all the loops, while the average 34 (38) 42 points form the neckline, the outer 13 (18) 22 points on each side form the lines of the shoulders. 

BEFORE 
Knitting like a back, but for a deeper cut-out, close the average 6 (8) 10 section of the neckline after 9.5 (11.5) 13.5 cm = 30 (36) 42 p. from the end of the thread color change and both sides finish separately. 

For rounding the cut close from the inside edge in each 2nd p. 1 time 3 p., 3 times 2 p. And 5 (6) 7 times 1 p. The remaining 13 (18) 22 p. Shoulders on both sides close at the height of the backrest. 

SLEEVES
Thread mallow thread dial 75 (93) 111 p. And knit a zigzag pattern, changing the color of the thread in the specified sequence. 

After 8 cm = 24 p. from typesetting series continue to knit the front embroidery thread color mallow, with start from the personal number, knit facial, and in the same row, subtract, distributing evenly, 22 (29) 33, p. = 53 (64) 78 n. 

For OKATO close to both sides through 1.5 cm = 4 p. from the end of the change of the color of the thread 1 time for 3 p., then in each 2nd p. 2 times by 2 points and 2 times by 1 point. Through 8.5 cm = 26 p. from the end of the thread color change, close the remaining 35 (46) 60 p. 

ASSEMBLY 
Run side seams and sleeve seams, sew the sleeves in the armholes in the lower part between the marks * and *, leave the upper parts of the openings for the shoulder cutout.

Crochet the edges of the neckline and the edges of the shoulder cutouts 1 r. Art. b / n thread color mallow.








Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments