Carmen

Openwork blouse with free PATTERN

Click For Crochet Abbreviations List

Dimensions: 36/38 (42) 46/48 
You will need: 

500 (550) 600 g of yarn of the type "Algarve" from AUSTERMANN of gray-brown color number 58 (100% cotton, 142 m / 50 g); 

straight knitting needles No. 2 and 2.5 and circular knitting needles No. 2.5, as well as a hook No. 2. 
Shawl knitting number 2: persons. and izn. rows of knit faces. 
Subsequent patterns knitting needles No. 2.5. 
For all schemes: 

Only individuals are listed. rows. 

In izn. R. all loops and nakida knit purl, with successive nakida, knit them alternately worn. and izn. cross; individuals. cross to knit out. p. 

Openwork rhombuses: the number of loops is a multiple of 12 + 11+ 2 chrome. 

Knit according to scheme 1. 

Start with chrome. n. and loops before rapport, then constantly repeat rapport, finish loops after rapport and chrome. p. 
Repeat from the 1st to the 24th p.

Persons smooth surface: in the ranks: persons. R. - persons. n., izn. R. - ex. P.; in a circle. ranks: knit constantly facial. 

Fantasy pattern (of 108 p.): Knit according to scheme 2. 

Start loops before rapport, repeat 2 x rapport, finish with loops after rapport. 

Important: In the 15th p. in each rapport, 2 nakida are added, and when knitting the initial and last loop, 1 nakid is added, which is why the row is shown extended. 
Additions to the next. individuals. R. compensated again by a decrease. 
Connect 1 x from the 1st to the 72nd, then repeat 1 more from the 1st to the 54th. = 126 p. 

The sequence of alternating patterns:
24 p. delicate diamonds; 4 p. individuals. smooth surface; 126 r. knit in the trail. distribution: chrome. p., 6 (12) 18 p. smooth surface, 108 p. fantasy pattern, 5 (11) 17 p. faces. stitch, chrome. P.; 54 r. openwork lozenges = total 208 p., then finish the faces. satin stitch. 

Pattern for sleeves (from 57 p.): 
Knit according to scheme 3. 
Knit 4 x rapport, finish with loops after rapport. 
Repeat from the 1st to the 12th p. 

Pattern for edging: 
2 circle. R. individuals. smooth surface, 1 circle. R. with holes (* 1 broach = remove 1 p. as persons., 1 person. and stretch it through the removed p., 1 nakid, 2 p. together persons., 1 nakid, repeat from *), 3 circle. R. individuals. smooth = only 6 circle. R. 

The density of knitting: 
in the alternation of patterns: 25 p. And 37 p. = 10 x 10 cm;
Pattern for sleeves with faces. Satin: 25 p. and 36 p. = 10 x 10 cm; 
pattern for edging: 6 circle. R. = 1.5 cm. 

Back: 
Dial 121 (133) 145 p. And knit 1.5 cm = 9 p. garter stitch, while starting with 1 out. row. 
Then continue alternating patterns. 
At the same time for the bevel of the shoulder through 57 cm = 210 p. (58 cm = 214 p.) 59 cm = 218 p. from the strip on both sides close 1 x 8 p. and in each 2nd p. close 3 x 8 (9) 10 p. 

Simultaneously with the second decrease of the shoulder for the neckline, close the middle 21 (25) 29 s and finish both sides separately. 
For rounding off the inner edge, close in each 2nd row 1 x 8 p. And 1 x 4 p. 
After 59 cm = 218 p. (60 cm = 222 p.) 61 cm = 226 p. from the slat, close the remaining 6 (7) 8 p. of shoulder.

Before: 
Knit as a back, only for a deeper neckline after 51 cm = 188 p. (52 cm = 192 p.) 53 cm = 196 p. from the bar to close the average 13 (17) 21 p. and for rounding in each 2nd p. close 3 x 2 and 10 x 1 p. 

Sleeve: 
Dial 69 (79) 89 p. and knit 1.5 cm = 9 p. garter viscous. 
Then continue to the next. distribution: chrome. p., 5 (10) 15 p. of persons. smooth surface, 57 p. pattern for the sleeve, 5 (10) 15 p. smooth n. 

At the same time, for the bevel of the sleeve from the strip on both sides, add 6 x in each of the 12th p. 1 p. smoothing = 81 (91) 101 p. 

For dummy sleeves in 24.5 cm = 88 p. from the strip on both sides close 1 x 4 p. and in each 2nd p. 6 x 2, 3 x 1 x, 2 x 3 x and 2 x 4 p.

After 32 cm = 116 p. from the strap close the remaining 15 (25) 35 p. 
Assembling parts: 
Run shoulder seams. 

On the circular needles on the neckline raise 108 (116) 122 p. And knit 1.5 cm = 6 circle. R. pattern for edging. 

Then loop the crochet trace. way: 
consistently remove each other 6 (8) 8 s. as izn. and crochet knit together, 11 vozd. p., * 6 (7) 8 p. as izn. and crochet knit together, 11 vozd. n., repeat from * until all loops are used. 

After the last arch of the vozd. n. finish 1 connection Art. in the 1st knit link loop. 
Thread cut and stretch through the last n. 
Embed the sleeves according to the pattern. 
Run side seams and sleeve seams.






Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments