Click For Crochet Abbreviations List
SIZES
34/36 (38/40) 42
YOU WILL BE NEEDED
Yarn (47% cotton, 47% polyacryl, 6% polyamide; 165 m / 50 g) - 300 (350) 400 g pale green; Knitting needles number 4 and 4.5; circular needles number 4.
PATTERNS AND
SCHEMES GUM
Knit (knitting needles No. 4): edge, * 1 persons., 2 w., 1 faces., From * constantly repeat, edge.
All other patterns knit No. 4, 5.
PERSONAL SMOOTH
Facial rows - facial hinges, purl rows - purl loops.
FOR ALL THE FOLLOWING Openwork Patterns The
rapport is 8 loops. Begin and finish the edge, between the edge loops distribute, starting from the middle, repeat the repeat. Rapport openwork pattern B to perform over rapport openwork pattern A.
The diagrams are given only the front rows. In the purl rows, knit all loops and nakida with purl, when performing two nakidov in a row, knit the 1st nakid with the purl, the 2nd nakid - with the purl crossed.
When performing subtracts, make sure that the number of nakidov and knitted pattern loops together coincide.
Openwork pattern
Knit under the scheme 1. From the 1st to the 6th row to tie 1 time.
Openwork pattern
Knit under the scheme 2. 1 + 2-nd rows to tie 1 time.
NET PATTERN The
number of loops is a multiple of 4 + 2 edging. Start with edge and loop before rapport, repeat rapport, finish with loops after rapport and edge. Constantly repeat the 1-8th series. SEQUENCE OF PATTERNS 1 Knit 32 r. facial smoothness, * 6 p. openwork pattern A, 8 p. facial smoothing, 2 p. openwork pattern B **, 8 p. face stitch, from * to ** repeat 1 time, then knit the front stitch.
Knit under the scheme 3. On it are given only the front rows. In the purl rows, all the loops and nakida are knitted in the purl, when performing two nakidov in a row, the 1st nakid is knitted with the purl, the 2nd nakid is purse crossed.
SEQUENCE OF PATTERNS 2
Knit 1 purl row with purl loops,
104 (112) 104 р. mesh pattern,
1 face row with front loops = 106 (114) 106 r.
KNITTING DENSITY
22.5 p. X 30.5 r. = 10 x 10 cm, connected by a sequence of patterns 1;
22 p. X 27 p. = 10 x 10 cm, connected by a mesh pattern.
PERFORMANCE OF THE
BACKING
On the needles, dial 106 (114) 122 points and knit for a slat 4.5 cm = 13 p. gum, starting with 1 out. row. In the last row, add 1 p., Then knit according to the sequence of patterns = 107 (115) 123 p.
For fitting, starting from the plank, on both sides 9 times in each 8th p. reduce by 1 p. = 89 (97) 105 p., then for one-piece sleeves on both sides in the next 2 r. additionally dial 1 x 1 p., in each 4th p. 2 times in 1 p. And in every 2nd p. 4 times for 1 p., 1 x 2 p., 2 times for 4 p. And 1 x 5 p. = 133 (141) 149 p.
Through 44 cm = 134 p. (46 cm = 140 p.) 48 cm = 146 p., Starting from the bar, for the shoulder bevels on both sides close 1 x 2 (3) 3 p. And in each of the 2nd p. close 3 times 2 points and 10 times 3 points (13 times 3 points) 9 times 3 points and 4 times 4 points.
At the same time for the neck through 49 cm = 150 p. (51 cm = 156 p.) 53 cm = 162 p. from the strip average 43 p. close and finish both sides separately.
For rounding the neck at the inner edge in each 2nd p. close another 1 x 3 p., 1 x 2 p. and 2 x 1 p. On the spokes dial 106 (114) 122 p. and knit for a slat 4.5 cm = 13 p. gum, starting with 1 out. row. In the last row, add 1 p., Then knit according to the sequence of patterns = 107 (115) 123 p. Tie up the sleeves and shoulder bevels, as on the back.
Through 52.5 cm = 160 p. (54.5 cm = 166 p.) 56.5 cm = 172 p. from the strap all the loops will be spent.
BEFORE
At the same time to round the bottom of the strap knit shortened rows. To do this, knit 3 sections from the right edge and rotate the work with 1 nakida, * remove the 1st loop as a purse and finish the row to the end, turn, knit 6 points, i.e. 3 points more than in the previous row, with a nakid knit together with the next loop of the front, turn with 1 nakida, from * constantly repeat. In the front rows to increase the number of loops, for this, knit 4 more times for 3 p., 3 times for 4 p., 2 times for 5 p. And 1 x 6 p.
Then these loops are postponed and the left side should be mirrored, starting from the front row and the last 3 loops, after turning the yarn, knit together with the next loop from the back.
Then again knit all the loops together.
For a V-shaped neckline through 17 cm = 52 p. (19 cm = 58 p.) 21 cm = 64 p., Starting from the bar (measured in the middle), close the middle loop and finish both sides separately. For the bevel of the neckline on the inner edge 23 times in each 2nd p. and 5 times in every 4th p. reduce by 1 p. At the height of the backrest all the loops will be spent.
SLEEVES
Knit from top to bottom. To do this, first perform shoulder seams. The arrow on the pattern indicates the direction of knitting.
At the edges of the armhole, type on the spokes of 68 (78) 88 points and knit according to the sequence of patterns 2, in the 1st purl row evenly reduce 14 (16) 18 points = 54 (62) 70 points.
Through 39.5 cm = 106 p. (42 cm = 114 p.) 39.5 cm = 106 p. from the set of loops in the next purl row, all loops are closed by purl.
ASSEMBLY
Run side seams and sleeve seams.
Along the edge of the left bevel of the neckline, dial 52 kn. Needles, tie a 1 point in the corner of the cutout, dial 52 point along the edge of the right bevel and dial 56 paragraph = 161 paragraph along the edge of the neckline. knit the necklines like this: 1 p. of purl, 1 p. of facial and 1 p. of purl, and on both sides of these loops start and end with 2 facial.
To make the neck shape in every 2nd krug.r. Tie together 3 sections of the cut-out angle as follows: remove 2 sections together as facial ones, knit 1 section according to the pattern and stretch the removed loops through it. After 4 cm = 12 krug.r. all loops close on the picture.
Source