Fiona

Top striped and openwork cardigan free pattern

Click For Crochet Abbreviations List

DIMENSIONS 
36/38 (40/42) 44/46 

YOU WILL NEED 
Yarn (100% cotton; 180 m / 50 g) - for a jacket 350 (350) 400 g mint, for a top 100 (150) 150 g gray-brown, and 50 (100) 100 g mint and ecru color; Spokes number 3 and 3.5; circular needles number 3; for a jacket 5 wooden buttons with a pattern of a tree. 

PATTERNS AND 

SCHEMES 
GUM: An odd number of loops. Each row start and finish 1 edge. 

Facial rows: alternately 1 facial, 1 purl, finish 1 facial. 

Purl rows: knit loops on the picture. With an even number of loops in the front and back rows between the edges, constantly knit alternately 1 face, 1 purse. 

PERSONAL SMOOTH 
Facial rows - facial hinges, purl rows - purl loops. 

Openwork pattern
The number of loops is a multiple of 18 + 11 = knit acc. pattern. On it are given facial rows. In the purl ranks all the loops and nakida knit purl. Start with loops before rapport, repeat regularly, repeat loops after rapport. Constantly repeat 1st to 28th rows. When performing subtracts, make sure that the number of nakidov and knitted loops coincide. 

PLATED VYAZKA Front 
and back rows - front loops. 

GRAIN BACKING 
Facial rows - purl loops, purl rows - facial loops. 

SEQUENCE 
OF STRIPS On 2 rows * with mint thread, thread of color ecru, gray-brown thread, from * constantly repeat. 

STRETCHED UNITS 
Right edge: edge, 1 purl, 2 loops knit together purl.

Left edge: 2 loops tied together purl crossed, 1 purl, edging. 

KNITTING DENSITY 
23 p. X 35 p. = 10 x 10 cm; 
26 p. X 33 p. = 10 x 10 cm. 

CAUTION 
Knit sleeves right on the shelves and back from top to bottom. Arrow on the pattern = knitting direction. The sleeves, as a result of a set of loops, are set in position, which creates a slight puff effect. 

OPERATION EXECUTION 

CARDIGAN 
BACK 
In №3 dial needles 110 (120) 130 loop and tie the strap 5 cm gum, wherein the backing near one end and the purl purl row, uniformly distributed, add 11 p. = 121 (131) 141 n .

Continue work on the needles No. 3, 5 as follows: edging, 0 (5) 1 n. Face trim, 119 (119) 137 n. Openwork pattern, 0 (5) 1 n. Face smooth satin, edging. 

After 53 cm = 186 rows from the plank, close for the shoulder bevel on both sides 1 x 8 n., Then in each 2nd row close the 4 x 6 (7) 8 n. 

At the same time, 54.5 cm = 190 rows from the plank close for the neckline average 35 p. and both sides finish separately. 

For rounding along the inner edge, close in each 2nd row 1 x 3 paragraph and 1 x 2 paragraph. After 56 cm = 196 rows from the plank, close the remaining 6 (7) 8 paragraph shoulders. 

LEFT SHELF 
On the needles No. 3, dial 56 (60) 64 loops and tie the bar, as on the back, while in the last purl row, evenly distributing, add 6 (7) 8 items = 62 (67) 72 items.

Continue work on the needles No. 3, 5 as follows: edge, 0 (5) 1 p. Face trim, 60 (60) 69 p. Openwork pattern, while starting with loops before rapport, repeat rapport 3 times, finish with loops until the arrow A (A) B, edging. 

Attention! 
At the end of the row for the 1st and 2nd sizes in the 1-13th series of the scheme, as well as for the 3rd size in the 15-27th series of the scheme, instead of the last loop, knit 2 loops together with the front one with an inclination to the left (1 loop remove, as the front, 1 front, then stretch it through the removed loop). 

After 28 cm = 98 rows from the strip close for the neck on the left edge 1 x 1 p., Then in every 2nd row close 4 x 1 p. And in every 4th row 19 x 1 p. 

Shoulder bevel on the right edge perform as on the back. At the height of the back close the remaining 6 (7) 8 p. Shoulder.

RIGHT SHELF 
Knit the same way as the left shelf, but in a mirror image, with the loops distributed as follows: start with 1 edge, 60 (60) 69 p. Openwork pattern, while for the 1st and 2nd sizes perform rapport 3 times, finish loops after rapport; for size 3, start with the loops from the arrow C, repeat the pattern 3 times, finish with the loops after the repeat, 0 (5) 1 n. At the beginning of the row, instead of the 1st loop in the corresponding rows of the circuit, as on the left shelf, knit 2 loops together on the front. 

SLEEVES 
Run shoulder seams. 

On the top 15 (17) 19 cm of the shelves and backs on the spokes No. 3.5, dial 95 (103) 113 loops and knit as follows: edge, 5 (0) 5 p., Face trim, 83 (101) 101 p. Openwork pattern , 5 (0) 5 p. Front surface, edging.

After 23.5 cm = 82 rows from the start of knitting the sleeves in the next front row, do not carry out knitwear and additionally for the 1st and 3rd sizes on both sides after and before the edge knit 2 x 2 loops together = 65 (71) 77 n. 

Through 24 cm = 84 rows from the start of knitting the sleeves to knit for a strap on the needles No. 3 with an elastic band. With a width of 5 cm, close all hinges according to the pattern. 

ASSEMBLY 
Run side seams and sleeve seams.

For the bey, dial 280 loops on the circular needles along the sides of the shelves and the edge of the neck and knit garter stitch. After 1.5 cm from the beginning of knitting the strap, make 5 holes for buttons as follows: close 2 loops and re-dial in the next row. Make the 1st hole for a button through 4 sections from the bottom edge, the other 4 at intervals of 10 points. With a slat width of 3 cm, close all loops, as front ones. 

Sew buttons. 

TOP 
BACK 
Gray brown thread on the needles No. 3 dial 117 (127) 137 loops and tie 2 cm for the strap with a rubber band. 

Continue to work on the needles No. 3.5 purl stitch acc. sequence strips. 

At the same time, for the beading, it is emphasized to lower on both sides in each 6th row from the bar 7 x 1 p. = 103 (113) 123 p.

After 16 cm = 52 rows from the strip add 1 x 1 p. On both sides, then alternately in each 8th and 10th row add 6 x 1 p. (In each 8th row 6 x 1 p.) Alternately in every 6th and 8th row 6 x 1 p. acc. thread color = 117 (127) 137 p. 

After 102 rows from the plank, close for the armholes on both sides 1 x 5 p., then underlined underlined in each 2nd row 6 x 1 par. and in each 4th row 4 x 1 p. = 87 (97) 107 p. 

After 45 cm = 148 rows from the plank close for the mouth of the average 51 p. And finish both sides separately. 

For rounding along the inner edge, it is underlined to lower in each 2nd row 7 x 1 n. 

After 52.5 cm = 174 rows from the plank, close the remaining 11 (16) 21 n. Shoulders. 

BEFORE
Knit like a back, but for a deeper neck, after 41 cm = 136 rows from the strip close the middle 35 points, then in each 2nd row close 1 x 5 points and underscore 10 x 1 points. 

ASSEMBLY 
Run shoulder seams . 

For the bei with a gray-brown thread, dial on the circular needles along the edge of the neckline 168 loops and tie 1.5 cm with a rubber band in circular rows (= alternately 1 front, 1 wrong). Then close the loop on the picture. 

Gray-brown thread dial on the needles at the edges of the armholes on 104 (110) 116 loops and tie 1.5 cm with an elastic band. Then close the loop on the picture. 

Run the side seams, including the ends of the slats.








Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments