Hazel

Jumper with a collar collar

Click For Crochet Abbreviations List


Sizes: 46-48, chest 92-96 cm

You will need: 650 g of blue (number 06) of the tape yarn Alpina Nori (56% acrylic, 44% cotton, 100 m / 50 g), straight and circular knitting needles No. 3,5.

Gum 1/1: 1st p.: * 1 faces., 1 out. *, Repeat from * to * to the end of the p. 2nd and subsequent r .: knit according to the drawing.

Wrong surface: faces. R. faces. n., out. R. - out. p.

Aransky pattern: knit according to pattern 1. Repeat from 1st to 26th p.

Scythe: knit according to scheme 2. Repeat from the 1st to the 6th p.

Hollow gum:

1st circle. p.: * 1 persons., 1 out. *, repeat from * to *.

2nd circle. p.: * 1 persons., 1 p., remove the thread before work *, repeat from * to *.

3rd circle. p.: * 1 p., thread at work, 1 out. *, repeat from * to *. Repeat 2nd and 3rd circle. R.

Semipatent gum:

1st circle. p.: * 1 persons., 1 out. *, repeat from * to *.

2nd circle. p.: * 1 persons., double crochet, 1 out. remove *, repeat from * to *. 3rd circle. p.: * 1 persons., 1 out. and yarn of the previous p. knit out., repeat from * to *. Repeat 2nd and 3rd circle. R.

Knitting density: 24 p. And 25 p. = 10 x 10 cm.

Attention: the back and the front with the sleeves fit across.

Knitting sweaters - diagram with a description of the
back: dial 52 p. And knit 5 cm (12 p.) With an elastic 1/1. Continue work according to scheme 1. For bevels, add sleeves in each 7th p.: At the beginning of the p. after 3rd persons. and at the end of the river. in front of 3rd persons. 10 x 1 p.

Added p. Knit out. stitch. Having completed 29 cm (72 p.) From the beginning of the work according to the scheme, add at the end of the p. 48 p. Continue the work as follows: chrome., 3 persons., 11 p. Out. smooth surface, 44 p. according to the scheme 1.11 p. smooth, 6 p. according to the scheme 2, 44 p. according to the scheme 1.3 persons., chrome.

Knit like that 45 cm (112 p.). Close 48 p. Backs and knit on the remaining p. For bevels, close the sleeves in each 7th p. 10 x 1 p., Knitting 2 p. Together out. after 3 persons. at the beginning of the river. and in front of 3 persons. at the end of the river. Next, tie 5 cm (12 p.) With a 1/1 elastic band, after which all the p.

Before: knit like a back. Having completed 29 cm (72 p.) From the beginning of the work according to the scheme, add at the end of the p. 48 p. Continue to work on all p „as on the back.

Having completed 10 cm (24 p.) From the beginning of work on all p., To cut the neckline close at the beginning of the p. 4 p., In every 2 r. 1 x 2 p. And 5 x 1 p. Continue to work on the remaining p. Having completed 88 p.

from the beginning of the neckline, add 5 x 1 p., in every 2 r. 1 x 2 p. And 1 x 4 p.

Continue work at all p. Having completed 112 p. from the beginning of work at all p., close at the beginning of the river. 48 p. Backs and knit on the remaining p.

For bevels, close the sleeves in each 7th p. 10 x 1 p., Knitting 2 p. Together out. after 3 persons. at the beginning of the river. and in front of 3 persons. at the end of the river. Next, tie 5 cm (12 p.) With a 1/1 elastic band, after which all the p.

Assembly: perform shoulder and side seams, sleeve seams. On the edge of the neckline, dial 96 p. (Odd p. For the front wall, and even p. For the back wall).

Tie 2 circle. R. hollow rubber band. Continue to work with semi-patent rubber. Having completed 15 cm (37 p.), Close all items.








Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments