Click For Crochet Abbreviations List
Russian Size: 44/46
You will need: 100 g color. rust, 75 g violet and copper, 50 g dark red and 25 g eggplant Nova yarn (48% wool, 32% camel wool, 20% polyamide; 180 m / 25 g); 100 grams of Red-Brown Passion (82% baby alpaca wool, 16% polyamide, 2% elastane; 132 m / 25 g); Knitting needles number 5.5: circular needles number 5.5.
Knitting technique.
Shawl: facial and purl rows - facial loops.
The front smooth surface: front rows - front loops, purl rows - purl loops.
Jagged pattern: the number of loops is a multiple of 14 + 1 + 2 chrome. Knit under the scheme 1, which are given the front and purl rows. Start with 1 edge and loops before rapport, repeat repeat constantly, finish with loops after rapport and 1 edge. Constantly repeat the 1st and 2nd rows.
The sequence of patterns and stripes A: 10 rows of the front satin thread col. rust, then a jagged pattern of 4 rows of copper, 6 rows of dark red, 6 rows of thread col. rust and 6 rows with a copper thread = 22 rows; finish with 2 rows of the front satin finish with a purple thread and a Passion thread, respectively = total of 36 rows.
The sequence of bands In: * 2 rows of thread col. rust, purple, dark red, Passion, copper, eggplant thread, from * repeat 4 more times = only 60 rows.
Year (first in 24 loops): knit according to scheme 2, where only rows of reductions are given. In the purl rows, knit all the loops in the purl, in the 4 rows between them, knit all the loops with the front satin stitch. Run 1 time 1–56th row. After the 55th row, 4 pins will remain on the spokes
The sequence of bands C: 8 rows of thread col. rust, 8 rows of copper, 12 rows of thread col. rust, 6 rows of violet, 8 rows of dark red, 16 (0) rows of eggplant, 24 (0) rows of copper, 4 (0) rows of the string Psiónе, 8 (0) rows of the thread col. rust, 6 (0) rows of copper = total 100 (42) rows. Figures in brackets refer to sleeves.
Underlined increments:
right edge - chrome., 2 front, 2 loops knit together front;
the left edge - knit according to the pattern to the last 5 loops, knit 2 loops together with the front one with a tilt to the left (1 loop to remove as the front one. 1 front, then stretch it through the removed loop), 2 front ones, chrome.
The sequence of bands D: 2 rows of violet, 10 rows of thread col. rust, 6 rows of copper, 10 rows of violet, 8 rows of Passion thread, 8 rows of thread col. rust, 14 rows of purple thread = 58 rows in total.
Gum: the number of loops is a multiple of 4 + 2 chrome. Each row start and finish 1 edge. Facial rows: * 1 person., 2 out., 1 person., From * constantly repeat. In the purl rows of the loop knit by drawing.
The sequence of bands E: 10 rows of thread col. Rust, 6 rows of copper, 10 rows of violet, 8 rows of Passion thread, 10 rows of thread col. rust, * 2 rows violet, dark red, Passion thread, copper, eggplant, thread color. rust, from * repeat 2 more times, finish with 2 rows of purple thread = only 82 rows.
Knitting density: 22 p. And 31 p. = 10 x 10 cm.
DESCRIPTION OF WORK
Back: thread col. rust dial 171 p. for knitting needles and tie 1 cm = 3 rows of garter stitch for strap, starting with 1 purse row. Continue work according to the sequence of patterns and strips A, while in the last front row (= 1st row with the Pessio thread) decrease in the middle of 1 p. = 170 p. Continue working as follows according to the sequence of strips in 11.5 cm = 36 rows from the bar In: chrome., * 24 p. Face smooth, 24 p. Year, from * repeat 2 more times, finish 24 p. Face smooth, chrome. Through 29.5 cm = 92 rows from the plank (110 pts on the knitting needles) knit with the front satin stitch, while continuing the sequence of strips B. After 31 cm = 96 rows from the plank continue working according to the sequence of strips C. After 2.5 cm = 8 rows from the beginning of the sequence of lanes C should be underlined to decrease for 1 x 1 pt on both sides, then in each 8th row 2 x 1 p. and in each 6th row 5 x 1 p. = 94 p. After 20 cm = 62 rows from the beginning of the sequence of bands C, add 1 x 1 p. on both sides, then in each 6th row, 6 x 1 sections (= after and before the edge knit, 1 facial cross of cross thread is knitted) = 108 paragraph. After 32 cm = 99 rows from the beginning of the sequence of strips C, add in the next back row to balance the pattern in the middle 1 p. = 109 p. And 32.5 cm = 100 rows from the beginning of the sequence of strips C knit in 22 rows with a toothed pattern according to the sequence of patterns and colors A, with e th pattern on both sides to complement the front surface of the loops 4, respectively. After 7 cm = 22 rows from the change of the pattern, continue to work with the front satin according to the sequence of bands D. After 15 cm = 46 rows from the last change of the pattern, close for the shoulder bevel on both sides 1 x 4 points, then in each 2nd row close 2 x 4 points and 3 x 5 points. Simultaneously 17 cm = 52 rows from close the last pattern change for the neckline averages 37 points and finish both sides separately. For rounding along the inner edge, close 2 x 2 points in each 2nd row. After 19 cm = 58 rows from the last pattern change, close the remaining 5 points of shoulders.
Before: knit like a back, but for a deeper neck, after 12.5 cm = 38 rows from the last change of the pattern, close the average 23 points, then in each 2nd row close 1 x 3 items, 2 x 2 items. and 4 x 1 p.
Sleeve: with a purple thread, dial 50 knots for each sleeve and tie 13 cm for the strap with an elastic band, while in the last purl row add 1 pt = 51 pt in the middle. Continue using a toothed pattern according to a sequence of strips C, and sides add 3 loops to the front surface respectively. At the same time add for the bevel of the sleeves on both sides in each 10th row from the bar 3 x 1 p. And in each 8th row 10 x 1 p. Front smooth = 77 p. Simultaneously in 13.5 cm = 42 rows from the bar continue to work with the front satin stitch according to the sequence of bands E. After 26.5 cm = 82 rows from changing the pattern, close all the loops.
Assembly: perform shoulder seams. For a collar with purple thread, dial 108 pp into circular knitting needles along the edge of the neckline and knit with an elastic band in circular rows (= 2 persons alternately., 2). After 23 cm from the beginning of the knitting of the collar, close all the loops according to the pattern. Sew the sleeves, complete the side seams and the seams of the sleeves.