Click For Crochet Abbreviations List
DRESS
Size: 44/46.
You will need: 400 g of Alpina “ROLAND” yarn (100% alpaca: 200 m / 50 g) olive; Knitting needles № 2,5; circular needles number 2.
Facial smoothness: persons. R. - persons. n., izn. R. -niz n.
Pattern "openwork track": knit according to the scheme; hollow gum:
1st row: * 1 persons. p., thread before work. 1 loop to remove, as out. p. without proving *. Repeat from * to *.
2nd row: knit facial loops and remove them from the inside of the previous row. Repeat from the 1st to the 2nd rows.
Knitting density: 25 p. X 36 p. = 10 x 10 cm, connected on the spokes of number 2.5 persons. satin stitch.
Back (bottom): with an additional thread on the needles No. 2.5 dial 98 points and knit 2 p. individuals. satin stitch. In the 3rd p. Distribute loops as follows: 1 chrome. p., 3 persons. n., * 2 int. p., 6 persons. n. *, repeat from * to * 10 times, 2 w. p., 3 persons. Clause, 1 chrome. P.
To expand the skirt to perform increases in the purses in each 9th p. 9 times 1 p.
On the needles = 206 p. From the 87th p. from the beginning of knitting in the purses knit pattern "openwork track". From 191 r. from the start of knitting knit 4 p. hollow rubber band. In the 195th p. from the beginning of the knitting loop close with a needle.
Before (bottom): knit, like a back (bottom).
Back (top): remove the extra thread. On the needles number 2.5 dial 98 p. And knit 78 p. Persons. satin stitch. For decoration of the line of the sides in the 11th p. from the start of knitting, perform increments on both sides by 1 p., then in each 10th p. 4 times 1 p.
On the knitting needles = 108 p. For making a line on the armhole in the 79th district, from the beginning of knitting close on 4 sides on both sides, then in each 2nd district. 1 time for 3 p., 1 time for 2 p., 1 time for 1 p. On the needles = 88 p. For the decoration of the neckline in 131 r. from the beginning of knitting, close the middle 28 points and on both sides of them in each 2nd p. 1 time for 5 p., 1 time for 3 p., 1 time for 2 p., 1 time for 1 p. On the needles = 19 p. In the 141st p. from the start of knitting all petti close in the same row. The left shoulder to perform similarly.
Front (top): knit, like a back (top). For decoration of the neckline in the 93rd p. from the beginning of knitting, close the middle 14 points and on both sides of them in each 2nd p. 1 times 5 points, 1 time 3 points, 3 times 2 points, 4 times 1 point. On the needles = 19 point. In the 141st p. from the start of knitting all the loops close in the same row. The left shoulder to perform similarly.
Assembly:
Run shoulder and side seams. On the line of the neck on the circular needles number 2 dial 178 p. And knit 4 p. hollow rubber band. In the 5th p. close all hinges with a needle. Along the line armhole on the circular needles No. 2 dial 110 p. And knit 4 p. hollow rubber band. In the 5th p. close all hinges with a needle.
JACKET
Size: 44/46.
You will need: 400 g of Alpena "ROLAND" yarn (100% alpaca: 200 m / 50 g) olive color: needles No. 4,
hook number 2.5; 6 pieces hooks.
KNITTING TECHNIQUE
On the spokes: the front smooth surface (faces. P. - faces. P., Worn. - izn. P.).
Crochet: air loops (v. P.). columns without na-kid (Art. b / n).
Density of knitting: I am 19 p. X 27 p. = 10 x 10 cm, connected on the spokes of the number 4 persons. Satin thread in 2 addition.
Back: on the needles number 4 dial 90 p. And knit 92 p. individuals. satin stitch. For decoration of the line of the sides in the 11th p. from the beginning of knitting, close on both sides 1 p., then in each 10th p. 2 times in 1 p. On the needles = 84 p. In 50 p. from the start of knitting, perform increments on both sides by 1 p., then in each 15th p. 2 times 1 p., In each 12th p. 1 time for 1 p. On the needles = 92 p. For the design of the line armhole in 93rd p. from the beginning of knitting, close on 3 p., then in each 2nd p. 2 times 2 points, 3 times 1 point
On knitting needles = 72 p. To form a neckline in the 143 r p from the start of knitting, close the average 32 p.
On the pins = 20 p. In the 145 r p. from the start of knitting all the loops close in the same row. The left shoulder to perform similarly.
Right shelf: on needles number 4 dial 46 p. And knit 92 p. individuals. satin stitch. For decoration of the line of the side in the 11th p. from the beginning of knitting, close 1 p. on the right side, then in each 10th p. 2 times in 1 p.
On the needles = 43 p. In 50 p. from the start of knitting, perform increments on the right side of 1 p., then in each 15th p.
2 times 1 p., In each 12th p. 1 time for 1 p. On the needles = 47 p. For the design of the armhole line in 93rd p. from the beginning of knitting on the right side, close 3 p., then in each 2nd p. 2 times 2 points, 3 times 1 point
On the needles = 37 p. For the decoration of the neckline in the 119th p. from the start of knitting, close on the left side of 6 p., then in each 2nd p. 1 time for 3 p., 2 times for 2 p., 4 times for 1 p.
On the needles = 20 p. In 145 m p. from the start of knitting all the loops close in the same row.
Right sleeve: on the needles number 4 dial 56 p. And knit 64 p. individuals. satin stitch. To expand the sleeve in the 13th p. from the start of knitting, perform increments on both sides by 1 p., then in each 13th p. 3 times for 1 p. On the needles = 64 p. For the decoration of the line of dummy in the 65th district. from the beginning of knitting, close on both sides by 3 p., then in each 2nd p. 1 time 2 p. 1 time 1 p., In each 4th p. 2 times in 1 p., In every 2nd p. 8 times 1 p. In each 4th p. 3 times 1 p., In each 2nd p. 1 time for 2 p., 1 time for 3 p. On the needles = 16 p. In 111 m p. from the start of knitting all the loops close in the same row.
Left sleeve: knit, like right.
Assembly:
Run shoulder and side seams, seams on the sleeves. Sleeves sew in the armhole. Along the edge of the jacket, sleeves, along the waistline, lay with the hook “chain stitch” and tie up with st. b / n with elongated loops. For fasteners at the edges of the shelves to knit with a hook 2 p. Art. b / n Sew hooks.