Daisy

Tunic with narrow sleeves knitting

Click For Crochet Abbreviations List

Sizes: 36 (38/40) 

You will need: yarn (70% silk, 30% wool; 145 m / 50 g) - 550 (600) g burgundy; Spokes number 3 and 3.5: circular needles number 3 40 cm long. 

Figured gum A: the number of loops is a multiple of 16 +15 p. Knit according to scheme A. Begin with a loop before the 1st arrow, repeat the repeat of 16 p., Finish 14 p. After the 2nd arrow. In height 1 times run from the 1st to the 12th rows. 

Gum B: alternately 1 facial crossed, 1 purl: knit loops in the purl rows according to the pattern, crossed loops - purl crossed. 

Openwork pattern A (for front and back): the number of loops is a multiple of 20 + 19 p. + 2 chrome. Knit according to scheme B. To start with 10 points before the 1st arrow, repeat the repeat of 20 points, finish 11 points after the 2nd arrow. 6 times in height from the 1st to the 32nd p., Then once from the 33rd to the 46th p., Then move to the spokes number 3 and repeat the 45th and 46th rows.

Openwork pattern B (for sleeves): the number of loops is a multiple of 20 + 19 p. + 2 chrome. Knit according to scheme B. In height, repeat from the 1st to the 32nd row. 

Decorative increments: from the right edge = chrome., 2 p. Knit together the front. From the left edge = 2 n. Knit together the front one with the inclination to the left (= 1 n. Remove, as with the front knitting, knit the next loop face and the removed loop through the knit), chrome. 
Ad unit 

Knitting density: 26.5 p. X 37 p. = 10 x10 cm, connected by the front surface of the spokes number 3: 26 p. X 20 p. = 10 x 6 cm, connected with curly rubber A and rubber band B with the spokes No. 3.5: 26.5 p. X 34 p. = 10 x 10 cm. Connected with an openwork pattern with the needles No. 3.5.

Back: on the needles number 3.5 dial 121 (137) n. And for the lower strap knit 10 p. rubber band B, while in the 1st p. (= person. row) after chrome. start with 1 person. crossed and 1 out., row finish symmetrically. Continue the work, distributing the loops of the patterns as follows: chrome., * 1 persons. crossed, 1 out., from * repeat 2 times, 111 (127) n. figured gum A. ** 1 out., 1 persons. crossed, from ** repeat 2 times, chrome. 

Further, knitting needles No. 3 knit 7.5 cm = 28 p. face surface, while for size. 38/40 on the middle 127 p. Uniformly add 4 p. = 121 (141) p., On the first and last 5 p. Continue knitting as before.

After that, go to the spokes number 3.5 and continue to work with an openwork pattern, distributing the loops as follows: Krom., * 1 persons. crossed, 1 w., from * repeat 2 times, 111 (131) p. of openwork pattern, for this start from arrow a, 5 (6) repeat rapport from 20 p. and finish at arrow b, ** 1 w. , 1 person. crossed, from ** repeat 2 times. chrome 

Through 28.5 cm = 96 p. from the beginning of the openwork pattern, continue knitting with the openwork pattern on all the loops between the chrome. 

Through 56.5 cm = 192 p. from the beginning of the openwork pattern, first close on both sides for the armholes 1 time in 4 points and in each 2nd p. another 3 (4) times 2 p., then subtract 4 times 1 p. = 93 (109) p.

After 18 (20) cm = 64 (72) p. from the beginning of the armhole, close the middle 27 point for the neckline and first finish the left side. For rounding the neck close from the inside edge in each 2nd p. 1 time 4 p., 1 time 3 p. And 1 time 2 p. 

After 0.5 cm = 2 p. from the beginning of the neck, close from the outer edge for the shoulder bevel 1 time 6 (8) n. and in each 2nd p. 3 more times 6 (8) p. Finish the second side symmetrically. 

Before: knit like a back, but for a deeper neck, the average 19 points. Close after 14.5 (16.5) cm = 52 (58) p. from the beginning of the armhole and first finish the left side. 

For rounding the neck close from the inside edge in each 2nd p. 1 time 3 p., 3 times on 2 p. And 4 times on 1 loop.

Sleeves: on the needles number 3.5 dial 65 p. And for the strap knit 10 p. rubber band B, while in the 1st p. (= person. row) after chrome. start with 1 person. crossed and 1 out. row finish symmetrically. Further between chrome. perform 12 p. figured elastic band A and work to continue with an openwork pattern, for this after chrome. 3 times repeat rapport of 20 p., Finish at the arrow with, chrome. 

In 19 (11th) p. openwork pattern add on both sides for bevels 1 times for 1 p., then in each 18-m p. 2 times 1 p. And in every 16th p. 5 times 1 p. (In every 10th p. 10 times in 1 p. And in every 8th p. 2 times in 1 p.) = 81 (91) p. Add the added loops to the openwork pattern, with To this end, make sure that the number of nakid and knitted loops in external rapport is the same.

Through 44 (40) cm = 150 (136) p. openwork pattern to close on both sides for okat 1 times for 3 liters. and in every 2nd p. 1 more times for 2 p., 20 (21) times for 1 p., 2 times for 2 p. and 1 time for 3 p. = 17 (25) p. 

Through 15 (16) cm = 52 (54) cm from the beginning of the formation of the okat, close the remaining 17 (25) loops in the same row. 

Assembly: Run shoulder seams. On the circular needles number 3 dial on the edge of the neck 104 p. And knit for bei circle 2 cm = 8 p. gum B. Loops close. Sew sleeves. Run the seams of the sleeves and the side seams, while leaving the lower sections 42 cm in length left open for the cuts.














Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments