Click For Crochet Abbreviations List
DIMENSIONS
36/38 (40 / 42-44 / 46-48)
YOU WILL NEED
Yarn (100% flax; 110 m / 50 g) - 450 (500-550-600) g green; needles number 4; circular needles No. 4 with a length of 60 cm; 7 buttons with a diameter of 18 mm.
PATTERNS AND
SCHEMES OF GUM:
Alternately 1 person., 1 izn.
PERSONAL SMOOTH
Facial rows - facial hinges, purl rows - purl loops. In the circular rows of all loops knit facial.
RIBBED PATTERN
Knit according to the above scheme A. Start with 2 points in front of the right arrow, repeat the repeat of 3 points between the arrows and end 2 points after the left arrow. At a height of 1 times run from the 1st to the 6th row, then repeat from the 3rd to the 6th row.
Openwork pattern
Knit according to the above scheme B. Loops distribute acc. instructions. In height, repeat from the 1st to the 8th row. On ragland bevels, make sure that the number of nakidov and knitted loops on external rapport was the same.
DECORATIVE FIXTURES
From the right edge = chrome., 1 person., 2 points. Knit together the front one with an inclination to the left (= 1 point. Remove, as in the case of the front knitting, knit the next loop of the front one and pull it through the removed loop). From the left edge = 2 n. Knit together the front, 1 person., Chrome.
KNITTING DENSITY
6.5 p. X 32 p. = 10 x 10 cm, connected by a ribbed pattern;
16 p. X 25.5 p. = 10 x 10 cm, connected by an openwork pattern.
ATTENTION
Due to the different density of knitting patterns, the data given in the instructions do not exactly correspond to the measurements on the pattern.
PERFORMANCE OF WORK
BEFORE
Dial 85 (91-97-103) n. And for the lower bar knit 2.5 cm = 9 p. rubber band.
Then work to continue the ribbed pattern.
After 30 cm = 96 p. from the lower bar close on both sides of 2 p. and the loop between the chrome. Distribute as follows: 2 p. of front surface (= raglany bevel), 77 (83-89-95) p. of
openwork pattern, to do this, start with 4 p. in front of the right arrow, repeat the rapport of 6 p. between the arrows and finish 3 n. after the left arrow, 2 n. of the front surface (= ragling bevel) = 81 (87-93-99) n.
For raglan bevels, decoratively reduce on both sides in each 4th p. 6 times 1 p. And in every 2nd p. 3 (5-7-9) times for 1 p.
Through 9.5 (11-12.5-14) cm = 24 (28-32-36) p. from the start of the raglany bevels, close the neckline averages 31 (33-35-37) paragraphs and first finish the left side.
For rounding the neck close from the inside edge in each 2nd p. 1 time 4 p., 1 time 3 p., 1 time 2 p. And 1 time 1 p.
Through 3 cm = 8 p. from the beginning of the neck close the remaining 4 p.
Finish the second side symmetrically.
BACK
Dial 150 (91-97-103) paragraph and for the lower bar knit 2.5 cm = 9 points elastic.
Then work to continue the ribbed pattern.
Through 18.5 (20-21.5-23) cm = 64 (68-72-74) p. close the middle loop for the V-shaped neckline from the bottom rail and finish off the left side first.
For the bevel of the neckline, close from the inside edge in each 2nd p. 18 times 1 p. And in every 4th p. 7 (8-9-10) times 1 p.
30 cm = 96 p. distribute the loops from the bottom bar as on the front (start as described), and simultaneously close the raglan bevel from the outer edge 1 time 2 sections (according to the distribution of the loops for the front), then decoratively lower in each 4th p. 6 times 1 p. And in every 2nd p. 3 (5-7-9) times 1 p. = 4 p.
12.5 (14-15.5-17) cm = 32 (36-40-44) p. from the beginning of the raglan bevel, close the remaining 4 p. Finish the second side symmetrically.
SLEEVES
Dial 49 (55-55-55) n. And for the slat knit 2.5 cm = 9 p. rubber band. Then work to continue the ribbed pattern.
Through 12 cm = 38 p. from the plank add on both sides for bevels 1 times for 1 p. and in each 8th p. 2 times (in every 8th p. 2 times - in every 4th p. 5 times - in every 2nd p. 11 times) 1 p. = 55 (61-67-79) p. Extended loops include ribbed pattern.
Through 19.5 cm = 62 p. from the strap close on both sides of 2 p. and the loop between the chrome. Distribute as follows: 2 p. of the front surface (= raglany bevel), 49 (55-61-73) p. of openwork pattern, to do this, start with 4 p. in front of the right arrow, repeat the rapport of 6 p. between the arrows and finish 3 n. after the left arrow, 2 n. of the front surface (= ragling bevel) = 55 (61-67-79) n.
For raglan bevels, decoratively reduce on both sides in each 4th p. 6 times 1 p. And in every 2nd p. 3 (5-7-9) times 1 p. = 29 (31-33-41) p.
Through 12.5 (14-15.5-17) cm = 32 (36-40-44) p. from the beginning of the raglany bevels, close the remaining 29 (31-33-41) p.
ASSEMBLY
On the circular needles, dial on the bevels of the neckline on the back of 103 (107-111-115) p. and knit 25 cm = 9 p. rubber band. Hinges close.
Run rag seams.
For the strap connecting the two back halves, dial 37 (39-41-43) p. For circular needles, then dial at the edges of the neck and narrow ends of the slats 91 (97-105-113) p. = 128 (136-146-156 ) n. and knit 2.5 cm = 9 krug.r. rubber band. Hinges close.
For 2 straps, dial 7 p. And knit with a rubber band. To clarify the length of the straps, try on a pullover and adjust the length of the straps. Hinges close.
Sew the straps to the neckline of the neckline, to do this in the middle for the neckline leave open 15 cm, to the ends of the straps, grabbing the bar, sew on 1 button. Run the seams of the sleeves and side seams.
For 2 pat sleeves, dial 7 pts and knit 30 cm = 96 p. rubber band. Hinges close.
Sew one edge of the hem from the seamy side at a height of 14 cm in the middle of the sleeve, sew the other end of the hem from the front side at a height of 22 cm in the middle of the sleeve, as a result, the sleeve is slightly raised.
Sew on 1 button to the upper end of each pata (on the front side).
Sew the last button to the strap on the corner of the V-shaped notch.