Jenna

Women Wooly Top Free Pattern

Click For Crochet Abbreviations List

Size: 38/40 (46/48 in)

You will need to
550 (650) G pink yarn (55% merino wool, 33% microfiber, 12% cashmere, 125 m/50 g).
Straight and circular spokes № 4.

Elastic: Odd number of loops. Persons. R.: Krom., * 1 persons., 1 N., repeat from *, finish 1 persons., Chrome. IPMs. P.: Loops knit on the figure.

Openwork pattern: Number of Loops multiple 24 + 7 + 2 chrome. Knit according to the scheme, which shows only persons. P., in P. Loops knit on the figure, knitting scum Start with 1 chrome. and loops before raport, repeating rapport, finishing loops after rapport and 1 chrome. Repeat from the 1st to the 18th p. In Case of decrease and increase, make sure that the number of the scale corresponds to the number of loops that have been added together.

Purl Surface: persons. R.-Izn. P., N. P.-Persons. P.

The Density of Knitting: 22.5 p. and 29 P. = 10 x 10 cm.

Knitting pullover

Backrest: Dial 105 (129 in) and tie 2 cm elastic band. Then knit with openwork pattern. After 47.5 cm = 138 R. (42.5 cm = 124 R.) from the gum close to the armholes on both sides of 5 p. and in each 2 p. 1 x 3, 2 x 2 and 1 x 1 P. = 79 (103) p. In the future from the edge to start and finish after and to Chrome. 2 p. N. And then, instead of double-pulling, tie 2 p. Together (= Remove 1 p. as persons., 1 persons. And stretch it through the removed loop). After 66 cm = 192 p. From the gum close to the neck cut average 29 (33) p. and both sides to finish separately. For rounding close from the inner edge in each 2nd p. 1 x 3 and 1 x 2 p. Through 68 cm = 198 p. From the gum to close on each side of the remaining 20 (30) p. Shoulder.

Before: Knit the same, but for deeper neckline cut close through 60 cm = 174 R. From Gum medium 23 (27) p. and from the inner edge in each 2nd p. 1 x 3, 1 x 2 and 3 x 1 p.

Sleeves: Dial 47 (57) p. and tie 2 cm elastic band, while starting and finishing after and before Chrome. 1 N. Then to knit a openwork pattern, thus for size 38/40 to start with 1 chrome. and loops from Arrow A, Knit 1 raport, finish loop up to arrow B and 1 chrome. At the Same time from the gum add to the bevel sleeves on both sides in each 6th p. 20 x (in each 6th p. 7 x and in each 4th p. 20 x) 1 P. = 87 (111) p., including the added loops in the pattern. After 45.5 cm = 132 p. From the gum close to the sleeve of the sleeves on both sides 3 p. and in each 2nd p. 13 x 1 and 7 x 2 p. (6 x 1 and 14 x 2 p.). After 60 cm = 174 p. From the gum close the remaining 27 (37) p.

Assembly: Pop the shoulder seams. On a cut of a neck to dial on circular spokes 120 (128) p., to tie 2 sm an elastic band (= 1 persons., 1 izn. Alternately) and all loops to close on drawing. Fit the sleeves, carry out side seams and seams of sleeves.





Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments