Emily

SUMMER SUIT CROCHET FREE PATTERN

Click For Crochet Abbreviations List

Dimensions: 36/38 (44/46) 
you will need: 
for a pullover 300 (400) g of "Linarte" yarn from LANA GROSSA and for a skirt 350 (450) g ​​of beige Fb45 yarn (40% viscose, 30% cotton, 20% linen , 10% polyamide, 125 m / 50 g); 

straight needles number 3.5 and 4, as well as circular needles number 4; 

for a skirt: a rubber band by the size of a waist and 15 mm wide. Izn. smooth surface: individuals. R. - ex. n., izn. R. - persons. n. 

Pers. smooth surface: individuals. R. - persons. n., izn. R. - ex. n. 

Refers to the openwork pattern: the diagram shows the faces. rows. 

In izn. R. all loops and nakida knit izn. 

In case of decrease, make sure that inside the patterns the number of nakida corresponds to the number of loops knitted together.

Openwork pattern 1: The number of loops is a multiple of 20 + 1 + 2 chrome. 

Knit according to scheme 1. 

Start with chrome. n. and loops before rapport, then constantly repeat rapport, finish loops after rapport and chrome. p. 

Link 1 x from the 1st to the 62nd, then repeat from 57th to the 62nd. 

Openwork pattern 2: The number of loops is a multiple of 11 + 0 (7) + 2 chrome. 

Knit according to scheme 2. 

Between chrome. repeat the repeat (start with 1 chrome and the last 9 paragraphs of rapport, constantly repeat the repeat and finish with the first 9 paragraphs of rapport and 1 chrome.) 

Repeat from the 1st to the 6th p. 

The density of knitting: 
openwork pattern 1 and 2 on the needles number 4: 22.5 p. And 32 p. = 10 x 10 cm; 
tracery pattern 1 and 2 on the needles № 3,5: 23 p. and 34 p. = 10 x 10 cm

Pullover: 

Back: 
On the needles number 4 dial 103 (123) p. And knit for the strap 0.5 cm = 2 p. from satin stitch. 

Then continue with the openwork pattern 1. 

For the armhole sleeve through 27.5 cm = 88 p. from the strip on both sides close 1 x 4 p., then in each 2nd p. close 1 x 3, 1 x 2 and 1 (3) x 1 p. = 110 (118) 126 p. 

For neckline through 44.5 cm = 142 p. (48.5 cm = 156 p.) From the bar to close the average 33 p. And both sides finish separately. 

For rounding off the inner edge, close in each 2nd p. 2 x 5 p. 

Through 46.5 cm = 148 p. (50.5 cm = 162 p.) From the bar to close the remaining 15 (23) n. 

Before:
Knit as a back, only for a deeper neckline after 39 cm = 124 p. (43 cm = 138 p.) From the bar to close the average 23 p. And in each 2nd p. close 1 x 5, 1 x 3, 1 x 2, and 5 x 1 p. 

Sleeve. 
At the spokes No. 4, dial 57 (75) p. and knit 0.5 cm = 2 p. from satin stitch. 

Then continue with an openwork pattern 2. 

For bevel sleeves on both sides in the 3rd p. add 1 x 1 p., then 6 x in each 2nd p. (2 x in every 4th and 4 x in every 2nd p.) 1 p. = 71 (89) p. 

Add to include in persons. smooth surface 

For okata sleeves through 5.5 cm = 18 p. (7 cm = 22 p.) From the strap on both sides close 1 x 3 n. And in each 2nd p. close 18 (20) x 1, 1 x 2 and 1 x 3 (4) p. 

Through 19 cm = 60 p. (21.5 cm = 68 p.) From the bar to close the remaining 19 (31) p.

Assembling the details: 

Run shoulder seams. 

On the neckline of the circular needles, raise 116 points and continue the trace. way: 

1 circle. R. - ex. n., 1 circle. R. - persons. n., 1 circle. a row with holes = * 1 nakid, 2 p. together persons., repeat from *, 1 circle. R. - knit loops and nakida, 1 circle. a row - from n. 

Then close all the loops purl. 
Sew in sleeves, complete side seams and sleeve seams. 

SKIRT: 
Before: 
At the needles No. 3.5, dial 103 (123) p. And knit 0.5 cm = 2 for the slat. from satin stitch. 

Then continue with an openwork pattern 1. 

To shape it after 34.5 cm = 118 p. from the plank reduce 6 (7) x 1 p. trail. in the following way:

after chrome. 2 pp. together with a broach (= remove 1 pp. as persons., 1 pp. and stretch it through the removed p.), then in the middle of 4 (5) lanes of persons. smooth down to 1 p. and at the end of a row before chrome. knit 2 paragraphs together persons. = 97 (116) p. 

These reductions repeat 1 x in the next. 42nd p. and 1 x in the last. 24th p. = 85 (102) p. 

Through 57.5 cm = 196 p. from the strap to the belt at the waist, knit on all the loops of the faces. satin stitch. 

Through the next 2 cm = 7 p. knit 1 out. front row = fold line and then another knit 6 p. individuals. satin stitch. 

Then after 61.5 cm = 210 p. from the strap all loops close face. 

Back detail: do the same. 

Assemble the parts: 
Run the side seams.
Bend the belt along the fold line inward and sew, while leaving open a small opening for pulling the rubber band. 

Thread the gum and stitch at the ends. 
Doorway to close.





Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments